This is what we do
Rabbit Island open tanks
Designed and installed soft cover roof structures with access hatches for four open tanks at Rabbit Island, reducing odour while meeting structural and budget requirements.
Matai Dam aeration system
The mechanical fit-out of the Maitai Dam aeration system, installing compressors, pipework, and a hilltop manifold for air distribution.
Bell Island sludge tank & pipework
A 120,000-litre stainless steel sludge tank for Nelmac on Bell Island. The tank features multiple pipe penetrations, a recirculating sludge system with a Vaughan chopper pump, and a bypass to a transfer pump. Key additions include a pigging station with safety facilities and integrated water and air supply lines.
McCashins pipe bridge
Kernohan built a custom pipe bridge to link a new canning system, with pressure-tested lines for steam, CIP, CO2, and more.
Custom signage
Your imagination is our creation, you think it and we make it, the sky is the limit.
Immortalis / Southern Cross refit
This project was a major refit and re purpose of a 105ft mikata class cruiser to carry passengers.
CarterHolt Harvey pipe bridge
A new continuous drying kiln was installed on site and it required hot oil from the existing plant to heat the new kiln.