Matai Dam aeration system
The mechanical fit-out of the Maitai Dam aeration system, installing compressors, pipework, and a hilltop manifold for air distribution.
Bell Island sludge tank & pipework
A 120,000-litre stainless steel sludge tank for Nelmac on Bell Island. The tank features multiple pipe penetrations, a recirculating sludge system with a Vaughan chopper pump, and a bypass to a transfer pump. Key additions include a pigging station with safety facilities and integrated water and air supply lines.
McCashins pipe bridge
Kernohan built a custom pipe bridge to link a new canning system, with pressure-tested lines for steam, CIP, CO2, and more.
CarterHolt Harvey pipe bridge
A new continuous drying kiln was installed on site and it required hot oil from the existing plant to heat the new kiln.