This is what we do
Daiken maintenance shutdown
Executed a major shutdown at Daiken Southland’s MDF press plant with a 30-man team working days and nights. Successfully replaced the heating platen and stainless-steel belt, ensuring minimal downtime through precise coordination, safe execution, and around-the-clock effort.
CarterHolt Harvey pipe bridge
A new continuous drying kiln was installed on site and it required hot oil from the existing plant to heat the new kiln.